<H4>Manx Transport Trust</h4>

DRN 665D Ribble Leopard Restoration

1st June 1998 to 6th June 2009

Pictorial record following the restoration of DRN 665D. 1966 Ribble Leyland Leopard. Acquired in June 1998 along with 671.



671 has been dismantled over the years in order to supply a great many parts to aid the restoration of 665.


It is hoped that 665 can be returned to the road at some stage in 2009.

<-- Index | Showing 1-24 of 142 pictures | Next -->
<B>21st June 2009.  I made a start on cleaning the seats.  If they all come up like this I will be very pleased.<b>
21st June 2009. I made a start on cleaning the seats. If they all come up like this I will be very pleased.New
<B>20th June 2009.  Eleven seat frames rubbed down and undercoated!!! Thanks Barry.<b>
20th June 2009. Eleven seat frames rubbed down and undercoated!!! Thanks Barry.New
<B>13th June 2009.   New budget locks fitted, speedo drive replaced, S&T light switch changed, fuel sediment filter replaced, flexible fuel pipe also replaced. What else did we do?  Oh yes rubbed down some more of the chassis and painted a few bits silver.<b>
13th June 2009. New budget locks fitted, speedo drive replaced, S&T light switch changed, fuel sediment filter replaced, flexible fuel pipe also replaced. What else did we do? Oh yes rubbed down some more of the chassis and painted a few bits silver.New
<B>6th June 2009. Whilst bad weather postponed the TT races cleaning and painting continued.<b>
6th June 2009. Whilst bad weather postponed the TT races cleaning and painting continued.
<B>25th May 2009.  Bank holiday Monday was spent washing and cleaning the grit from  665.<b>
25th May 2009. Bank holiday Monday was spent washing and cleaning the grit from 665.
<B>23rd May 2009. So what have you been doing for the last eleven months...<b>
23rd May 2009. So what have you been doing for the last eleven months...
<B>23rd May 2009. Whilst 665 was in the yard the opportunity was taken to change the N/S rear wheel on 672 which kept deflating.<b>
23rd May 2009. Whilst 665 was in the yard the opportunity was taken to change the N/S rear wheel on 672 which kept deflating.
<B>16th May 2009.  One of the O/S/F brake shoe fulcrums had become pitted and had to be replaced..<b>
16th May 2009. One of the O/S/F brake shoe fulcrums had become pitted and had to be replaced..
<B>16th May 2009. O/S/F Hub refitted. Ran out of time to re connect the slack adjuster.<b>
16th May 2009. O/S/F Hub refitted. Ran out of time to re connect the slack adjuster.
<B>9th May 2009.  N/S front hub re-fitted, new kingpin installed.<b>
9th May 2009. N/S front hub re-fitted, new kingpin installed.
<B>4th April 2009. O/S/F hub cleaned and primed.<b>
4th April 2009. O/S/F hub cleaned and primed.
<B>4th April 2009. O/S/F axle cleaned and primed.<b>
4th April 2009. O/S/F axle cleaned and primed.
<B>4th April 2009. Fibreglass wheel arch panels painted silver.  N/S/F brake chamber resting on the front axle.<b>
4th April 2009. Fibreglass wheel arch panels painted silver. N/S/F brake chamber resting on the front axle.
<B>4th April 2009.  Front end of the chassis looking quite respectable. Just need to refasten the wiring harness.<b>
4th April 2009. Front end of the chassis looking quite respectable. Just need to refasten the wiring harness.
<B>29th March 2009. O/S/F hub steam cleaned, just need to transport it back to the barn in my car!<b>
29th March 2009. O/S/F hub steam cleaned, just need to transport it back to the barn in my car!
<B>28th March 2009. N/S/F hub and front drums re-painted.<b>
28th March 2009. N/S/F hub and front drums re-painted.
<B>28th March 2009. O/S/F Hub removed ready for steam cleaning.<b>
28th March 2009. O/S/F Hub removed ready for steam cleaning.
<B>28th March 2009. N/S/F painted silver.<b>
28th March 2009. N/S/F painted silver.
<B>28th March 2009. O/S/F de-greased ready for cleaning with a cup brush.<b>
28th March 2009. O/S/F de-greased ready for cleaning with a cup brush.
<B>7th March 2009. N/S front hub after steam cleaning.<b>
7th March 2009. N/S front hub after steam cleaning.
<B>7th March 2009. N/S front hub removed. Good opportunity to clean and paint before re-assembly.<b>
7th March 2009. N/S front hub removed. Good opportunity to clean and paint before re-assembly.
<B>7th March 2009.  Close up of N/S hub. Brake drum removed and shoes released for better access.<b>
7th March 2009. Close up of N/S hub. Brake drum removed and shoes released for better access.
<B>7th March 2009.  With slight play found in the king pins we had no alternative but to dismantle the hub assembly.<b>
7th March 2009. With slight play found in the king pins we had no alternative but to dismantle the hub assembly.
<B>28th february 2009.  Steering box fitted and towing eye also re-fitted.<b>
28th february 2009. Steering box fitted and towing eye also re-fitted.

View My Stats
Powered by WebRing.